Completed Sydney bathroom renovation with a timber vanity, stone top, brushed brass tapware and a walk-in shower

Mr. Clog Plumbing

Bathroom Renovation Plumbing Sydney

Complete plumbing fit-outs for bathroom renovations β€” done right, on time.

No surprise bills: $0 call-out and a fixed price before any work starts.

Our guarantee: 12 months on our workmanship, in writing. What it covers

Whether you're doing a full bathroom renovation or updating fixtures, Mr. Clog handles all the plumbing rough-in and fit-out work. We work with your builder or tiler, or we can manage the full project. From repositioning waste points to installing basins, showers, and bathtubs.

Original wall-mounted shower rose and cross handles in a yellow-tiled bathroom
Before: the original rose and cross handles, in a bathroom the owners were happy with otherwise.
The same shower recess fitted with a rain head and hand shower on a rail
After: a rain head and hand shower on a rail, same tiles, same recess. Not every bathroom needs gutting.
Completed ensuite in pink microcement and fluted tile, with aged brass tapware, a ceiling-mounted rain head and a vessel basin on a tiled bench
The other end of the same trade: a full ensuite in microcement and brass, ceiling-mounted rain head, wall-mounted basin mixer.
  • Full rough-in and fit-out plumbing
  • Works with your builder or as lead contractor
  • All fixture types β€” basins, showers, baths, toilets
  • Waterproofing advice and coordination
  • Inspections and compliance certificates

Fixed price quoted before we start. $0 call-out fee.

Finished bathrooms from recent Mr Clog jobs. We did the plumbing on every one.

Marble bathroom with walk-in shower, freestanding bath and hexagon floor tiles
Walk-in shower with wall-mounted mixer and hand shower beside a freestanding bath, set on a hexagon tile floor.
Green bathroom with terrazzo, twin wall-hung basins and brass wall-mounted tapware
Twin wall-hung basins with brass wall-mounted mixers, and a terrazzo shower behind fluted glass.
Powder room with a marble vanity, wall-mounted brass tapware and a wall-hung toilet
Powder room with a wall-hung toilet on an in-wall cistern and brass wall-mounted tapware over a stone vanity.
White bathroom with vertical tiles, black shower rail and black basin mixer
Frameless shower with a black rail shower and matching black basin mixer.
White bathroom with a shower over the bath, glass screen and vanity
Shower over bath behind a fixed glass screen, with a vanity basin alongside.

From the Job Sheet

Haberfield Β·

The problem

A home renovation needed new plumbing in two bathrooms, the kitchen, the laundry and the outdoor BBQ area, including gas to the BBQ.

What we did

We did the plumbing for the main bathroom, with a freestanding bath, double vanity, walk-in shower and wall-hung toilet, and for the second bathroom under its skylight. We also plumbed the kitchen sink in the island bench, the laundry sink and washing machine, and the outdoor kitchen's sink and gas BBQ, including the gas to the BBQ.

Main bathroom with a double vanity, wall-mounted taps and a freestanding bath under the window
Freestanding bath with a floor-standing bath filler, with the wall-hung toilet and walk-in shower beside it
Walk-in shower in the main bathroom with a linear floor drain, overhead shower and hand shower
Second bathroom under a skylight, with a double vanity and a wall-hung toilet
Double vanity and walk-in shower in the second bathroom
Kitchen island bench with the sink and mixer tap set into it
Kitchen island with the sink, looking out to the back yard
Laundry with a stainless steel sink and the washing machine under the bench
Outdoor kitchen with a built-in gas BBQ and a sink under a covered area

Parramatta Β·

The problem

The bathroom was being moved to a new location, so it needed new drainage.

What we did

We saw-cut the concrete slab, installed the new drainage to the new bathroom location, and backfilled the trenches with 11 mm blue metal.

Saw-cut trench in a concrete slab running out to the yard for new drainage
Trench cut through the concrete floor slab for a new drainage line
New PVC drainage and risers in the floor of a relocated bathroom

How It Works

01

We review your renovation plans and advise on waste and water supply positioning.

02

We install all rough-in plumbing β€” pipes, waste points, and water supply before tiling.

03

After tiling, we return to install and connect all fixtures and fittings.

04

We pressure-test, check for leaks, and provide compliance documentation.

Common Questions

Yes β€” repositioning drain waste and water supply points is common in renovations and is part of our rough-in service.

Not always, but it's much easier. Using Mr. Clog for both means continuity and accountability through the whole project.

Both options are available. We can supply quality fixtures or work with what you've purchased yourself.

Rough-in typically takes 1 day. Fit-off is another 1–2 days depending on the number of fixtures.

from 38 Google reviews
Read them on Google β†’
I want to acknowledge the high level of plumbing service I received. It was outstanding, and the bathroom-ware was exactly what I was looking for. I was so pleased with Matt from Mr Clog and the team. They went…
Vania T.Added to site May 2026
Excellent service and attention to detail. Matt was a pleasure to deal with throughout the whole process of upgrading our apartment.
Michael G.Added to site May 2026
Mr Clog did a fantastic job! The pipe excavation work was completed quickly, efficiently and professionally, with everything handled smoothly. The price was very fair and the service was excellent from start to…
Daniel & Stacey W.Kogarah Β· November 2026

See all reviews

Prefer not to call? Send a few details and we’ll come back to you with an upfront fixed price.

How urgent is it?

In a hurry? Call (02) 9139 8945 β€” we answer 24/7.

Call now for fast, reliable service β€” $0 call-out fee, available 24/7.

Call (02) 9139 8945Text